Delivering Innovative Ballastless Track Solutions Across the Globe

Design Proof Checking of Buffer Stop for 25 Kmph at Patna Metro Project and for 6Kmph, 10Kmph & 25Kmph at Sarita Vihar Metro Project .

Pre-Tender support for Dubai Metro Blue Line & HighSpeed Project NHRCL package- T1.

Track Design of Jerusalem Tram for 8 Km.

Design Calculation Report for Combined Checkrail Baseplate for CMR Project.

Design & Proof Chceking of W-Beam type Metal Fence.

Provided comprehensive tender support services to Rail Vikas Nigam Limited (RVNL) in Thailand.

Delivered multiple BOQ preparations, pre-bid design inputs, and engineering consultancy services to Ayesa India Pvt. Ltd.

Currently executing comprehensive BIM services for the Israel Metro Project under RUBI Group.
Projects Completed
Countries Covered
Track Length Designed
"The quality and pace of Rubi Railtecβs work in India are truly impressive, reflecting exceptional capability, commitment, and vision. It sets a strong foundation for future collaborations in the GCC and beyond."
- Ajay Yadav, Joint General Manager,"Had a great experience working with Rubi Railtec, the Swiss-based design consultancy, on our Dubai Metro and MAHSR bids. Their technical clarity and practical solutions stood out. Special thanks to Mr. Arun Kumar for his support and expertise. Truly appreciate their professionalism and look forward to future collaborations."
- Puneet Kumar, Chief Manager - M&BD,"Rubi Rail is an excellent partner for the design and FEM calculations of railway infrastructure components for both track and turnout applications. The company combines strong engineering expertise with practical railway know-how."
- Frank Meyer, Technical Director- Management-R&D,Let's Build the future of Rail Infrastructure together.
